Dieter Klose cuts notches for the bracing on the cantilevered bridge

After the logs were placed crossing the stream at Sandy Beach Dieter started to work on the notches for the strap anchors for the bridge.
- Posted in: Zieak

After the logs were placed crossing the stream at Sandy Beach Dieter started to work on the notches for the strap anchors for the bridge.
Recent comments