I’ve been working my tail off. My hand is red from paint splattering off the roller while painting two of the ball field dugouts today. Earl helped. Yesterday I finished up installing metal roofing on two of the dugouts. I also cleaned up a full car load of scrap wood from around the new concessions building.
Monday (Memorial Day) I worked on things at the house. I painted the horseshoe pit covers, pressure washed and tidied our side porch, sanded and stained a stool, and did as much as possible out in the sun.
Sunday we had a BBQ. Ryan, Sarah, Mitch, Lynsey, Seth, Coconut, Josh, Katie, CJ, Will, and Earl were all over and played horseshoes, drank beer, grilled, and sat around a fire in the evening.
Saturday I had Earl help me finish putting railings on bleachers and start putting metal roofing on one dugout. Then I whipped up some new window displays for Lux and we went to a wedding that evening.
Friday Earl helped me work on bleacher assembly until I had to go to help one of the artists for the pool project hang her work over the bleachers. We had a quiet(ish) finger food Friday.




